The 15’ wide x 94’ long concrete bridge and ramp was designed to increase productivity and efficiency for owner and sub-contractor accessing the owner’s dry dock. Crofton fabricated and installed pile driving templates then drove 22 ea. X 90ft plumb and 6 ea. X 100ft batter, 16” square precast concrete piles. Design and installed concrete false work and forms. Installed reinforcing steel, cast-in-place marine grade concrete. Then set the owner furnish steel dry dock transition ramp, abutment transition connection, mooring devices, and curb.