Crofton Industries was awarded the contract to perform mechanical and structural rehabilitation operations at several locations on the dam spillway, access bridge, and inlet works. Additional work included the restoration of the earthen embankment through the installation of 760 linear feet of articulating concrete matting along the upstream face of the earthen embankment portion of the dam.