Request a QuoteCareers

24 Hour Response Call 757.397.1131

Crofton

The Trusted Solution Since 1949

  • Home
  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events
  • Contact

Project Description: Crofton was contracted to make repairs to eight tower legs by installing approximately 900 linear feet of both 36" diameter and 14" H-pile shaped fiberglass jackets on the existing Dominion Energy Transmission tower legs located on the Rappahannock River near Tappahannock, Virginia. Each tower leg consisted of three legs and jacket installation lengths varied from 20 feet to 38 feet in length. The designated piles for repairs were first cleaned with high pressure washers and then existing bag style jackets were removed and existing concrete was chipped with light weight chipping hammers to expose steel tower leg member. All debris was collected and disposed of following state and federal guidelines. Next each pile was inspected and marked for steel member repairs. Crews then welded and bolted the custom fabricated shapes and plates to the designed members to strengthen the existing h-pile member prior to jacket encapsulation. Next custom reinforcing steel cages were installed around the existing H-piles and 5000-psi construction grout was placed to fill the void of each pile jacket system. Finally, the top perimeter of each jacket repair member was encapsulated with a marine grade epoxy sealer. The work was conducted at each tower location with the use of a Dominion supplied and Crofton installed 25 - 30' in diameter steel fabricated cofferdam and bubble curtain system. The cofferdam and bubble curtain system were installed to mitigate the tidal, environmental, and potential marine species affects during the repair and diving operations.

  • All

Currituck Sound Cable Crossing

Corrugated Pipe Culvert Repairs

Oil Pipeline Replacement

Transmission Line Foundation Rehabilitation

Transmission Tower Pile Repairs

Submarine Cable Installation

Pagan River HDD

Ocean City Gas Line

Kerr Reservoir Tower Foundation Rehabilitation

Tower Foundation Pile Upgrades

Turkey Island Cable Installation

Churchland Bridge Cable Installation

Harris Creek Cable Installation

Fiber Optic Cable Installation

  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
    • Location & Contact
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Subscribe
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events

Crofton Diving Corporation
16 Harper Avenue Suite #100
Portsmouth, VA 23707

Phone: 757.397.1207

Crofton Construction Services Inc.
16 Harper Avenue Suite #200
Portsmouth, VA 23707

Phone: 757.397.1319

Crofton Crane Rental & Rigging
16 Harper Avenue Suite #300
Portsmouth, VA 23707

Phone: 757.215.0258

Crofton
16 Harper Avenue
Portsmouth, VA 23707

Phone: 757.397.1131

© 2025 ยท Crofton | Privacy Policy | Website by Primm Advertising