Request a QuoteCareers

24 Hour Response Call 757.397.1131

Crofton

The Trusted Solution Since 1949

  • Home
  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events
  • Contact

Project Type: New Construction, Alteration, Repair, and Demolition

Project Description: For the upgrades to this barge loading facility and wharf, 280' LF of steel waler was replaced with existing tie rods refurbished via splicing of new end sections on to existing. 300' of existing timber bulkhead was demolished and 300' of concrete dead man was installed atop of 90 each 20" square concrete tension and compression piles. 300' of 62' long AZ-26 A690 sheet piles coated both sides with CTE top 30'. 300' of steel wale was installed and tied back to dead man with petrolatum-wrapped tie rods. 300' of bent-plate caps installed atop sheet pile wall. 580' of two-tier timber fender system was installed. 3,000 CY of existing material removed and 6,000 CY of new select fill as well as 4,200 tons of 21A was placed and compacted. 50,000 SF of macro-fiber reinforced concrete was placed directly under the prime contract and another approximately 50,000 SF of concrete placed in associated project. One existing ship bollard, atop of HP14x73 foundation piles, was extended to account for newly established grade. Eight-each 16" pipe pile bollards with steel-reinforced concrete foundations were installed.

  • All

Ash Pond Dyke Repair

Dock and Shoreline Improvements

Emergency Repair of Seawall and Elevated Walkway

Shoreline Stabilization

Bulkhead Improvements

Portsmouth Seawall Repair

Barge Loading Facility Improvements

Bulkhead Replacement Project

Barge Loading Facility & Wharf Upgrades

  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
    • Location & Contact
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Subscribe
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events

Crofton Diving Corporation
16 Harper Avenue Suite #100
Portsmouth, VA 23707

Phone: 757.397.1207

Crofton Construction Services Inc.
16 Harper Avenue Suite #200
Portsmouth, VA 23707

Phone: 757.397.1319

Crofton Crane Rental & Rigging
16 Harper Avenue Suite #300
Portsmouth, VA 23707

Phone: 757.215.0258

Crofton
16 Harper Avenue
Portsmouth, VA 23707

Phone: 757.397.1131

© 2025 ยท Crofton | Privacy Policy | Website by Primm Advertising