Request a QuoteCareers

24 Hour Response Call 757.397.1131

Crofton

The Trusted Solution Since 1949

  • Home
  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events
  • Contact

Crofton attends VSRA’s Health & Safety Seminar

September 27, 2018

On September 26th, Crofton sponsored and attended Virginia Ship Repair Association’s Annual Health & Safety Seminar. This year’s them: It’s Not Just Work, It’s Life. Thank you to the VSRA for keeping such an important topic at the forefront of our industry!

Crofton attends VSRA's annual Health & Safety Seminar.
John Davis (Safety Director), Sheryl Correia (HR Specialist), and Scott Malone (Asst. Safety Director) attend the expo portion of VSRA’s Health & Safety Seminar.

Rescue Simulation at Conowingo Dam

August 15, 2018

Since the spring of 2018, various team members have been undergoing high angle confined space rescue training. In July, Andrew Cornwell, Stephen Campbell, Daniel Unruh, and Lonnie Garner performed a rescue drill at Conowingo Dam to put their training to the test! 

Crofton performs rescue simulation on 100' cofferdam at Conowingo Dam.
Steve Campbell serves as rescue patient as the team practices hooking him up to the recovery harness before his descent down the 100-foot cofferdam.
Crofton performs rescue simulation on 100' cofferdam at Conowingo Dam.
Lonnie Garner stands by and assists Steve Campbell with his descent.
Crofton performs rescue simulation on 100' cofferdam at Conowingo Dam.
Lonnie Garner begins his descent down the 100-foot cofferdam to perform rescue simulation on Steven Campbell.

 

Crofton News: Above & Below | Summer 2018

August 3, 2018

Vol. 1 | Issue 2 | Summer 2018

Click to Download Your Copy

Welcome to the second issue of Crofton News: Above & Below! 
This newsletter highlights the exciting things we’ve been up to, above and below the waterline. In this issue you’ll find an exciting announcement about company growth, some exciting project stories including one with an industry first, and of course a little history!

We hope you enjoy this newsletter. If you would like to receive this quarterly update in your inbox, subscribe here. The newsletter will continue to be posted to our website as well as Facebook, LinkedIn, and Twitter.

We value history at Crofton. Because where we’ve been is part of where we’re going. And if you’re reading this, you are a part of our history!
Thank you for joining us!

Click to Download Your Copy

Emergency Salvage & Recovery at Chesapeake Bay Bridge Tunnel

July 30, 2018

On Friday evening, July 27th, Crofton Diving received a call from a representative of the Chesapeake Bay Bridge Tunnel regarding the tragic accident involving a tractor trailer and two passengers. In the middle of the night, divers made preparations for the salvage operation and arrived on site just before sunrise. Upon discovery of the tractor trailer, divers determined that the bridge had incurred no underwater damage. Crofton has a rich history of service on the Chesapeake Bay Bridge Tunnel, dating back to 1959 during preparations for its construction. This year, we are celebrating the 30th anniversary of providing ongoing underwater bridge inspections at the CBBT. Thank you to Roger Belch and Eric Mullen, who worked together to coordinate the dive team who would execute the salvage. Thank you to Sam Smith (Underwater Inspection Superintendent), Jeffrey Collins, Curtis Wade, and Lewis Myers—for their commitment and responsiveness during such a challenging salvage and recovery operation. And thank you to the tub and barge crews who transported the recovered trailer. Crofton wishes to convey our deepest condolences to the families of the drivers and to those involved in the accident.

  

The recovered tractor trailer is carried to Little Creek on the 230-ton 4100 Manitowoc crane barge, pushed by the Pinners Point on July 28th. Photos by The Virginian Pilot.

 

« Previous Page
Next Page »
  • Company
    • History
    • Leadership Team
    • Careers at Crofton
    • Safety
    • Affiliations
    • Location & Contact
  • Services
    • Commercial Diving
    • Equipment Rental
    • Crane Rental & Rigging
    • Marine Construction
  • Subscribe
  • Projects
  • Resources
    • Work With Crofton
    • Equipment Load Charts
    • News and Events

Crofton Diving Corporation
16 Harper Avenue Suite #100
Portsmouth, VA 23707

Phone: 757.397.1207

Crofton Construction Services Inc.
16 Harper Avenue Suite #200
Portsmouth, VA 23707

Phone: 757.397.1319

Crofton Crane Rental & Rigging
16 Harper Avenue Suite #300
Portsmouth, VA 23707

Phone: 757.215.0258

Crofton
16 Harper Avenue
Portsmouth, VA 23707

Phone: 757.397.1131

© 2025 · Crofton | Privacy Policy | Website by Primm Advertising