The Samson recently lifted and set a 277-ton, 100-foot-long dredging ladder in preparation for its installation. After collaboration between Crofton’s and the client’s engineers, a four-point pick with 80-foot long slings was determined to be the optimal rigging, with ladder having to be placed 3.5 degrees out of level. Thank you to the Samson crew for their execution of a safe lift!